SINGLE PHASE HYBRID INVERTER

JUP-3-10G2-LE

  • 3-10kW Rated AC Output Power
  • ARC fault detection optional
  • Support storing energy from diesel generator
  • Support on/off grid mode switch, EPS output
  • 20 PCS inverters parallel for off-grid operation
  • Independent AC input port for diesel generator
  • Colorful 5-inch touch LCD, IP65 protection degree
  • Support different power inverters parallel connection
  • Support battery charging/discharging according to the time setting
Why choose us?
We have rich service experience and research and development technology.

Stable supply chain

We have our own battery pack and inverter factories with more than 1.5GWh of Li-FePO4 battery packs and an annual production capacity of 80,000 inverters.

Local Warehouse

We will set up warehouses in mainstream markets to cover the surrounding area of 200-300 kilometers.

Accept Customization

We support OEM and ODM.

Excellent After-sales Service

We have more than 20 people after-sales team, which can reply any of your questions in 7*24 hours.

Strong R&D Team

We have a R&D team of more than 30 people, and our engineers have more than 10 years of R&D experience in top companies in the industry.

Competitive Payment Terms

We support a variety of payment methods, such as T/T, L/C, Alibaba Trade Guarantee Payment, paypal, alipay and so on.

Technical Data

ModelJup-3G1-LE
Jup-3G2-LE
Jup-5G1-LE
Jup-5G2-LE
Jup-6G1-LE
Jup-6G2-LE
Jup-8G1-LE
Jup-8G2-LE
Jup-10G1-LE
Jup-10G2-LE
Battery Input Data
Battery TypeLead-acid or Li-ion
Battery Voltage Range (V)40-60
Max. Charge Current (A)70140190190210
Max. Discharge Current (A)70140190190210
Charging Curve3 Stages/Equalization
External Temperature SensorOptional
Charging Strategy for Li-Ion BatterySelf-Adaption to BMS
PV String Input Data
Max. DC Input Power (W)4500750090001200015000
PV Input Voltage (V)370(125~500)
MPPT Range (V)150~425
Start-up Voltage (V)120
PV Input Current (A)1717+1717+1726+2626+26
Max. PV ISC  (A)2020+2020+2034+3434+34
No. of MPPT Trackers12222
No. of String Per MPPT Tracker11+11+12+22+2
AC Output Data
Rated AC Output Power and UPS Power (W)300060008000800010000
Max. AC Output Power (W)360072009600960012000
Peak Power(off grid)2 times of rated power, 10s1.8 times of rated power, 10s
AC Output Rated Current (A)13.65/13.0522.7/21.727.3/26.134.5/3345.5/43.5
Max. AC Current (A)25/14.3525/23.930/28.740/38.350.0/47.8
Max. Continuous AC Passthrough (A)4040405060
Power Factor0.8 leading to 0.8 lagging
Output Frequency and Voltage50/60Hz,220/230Vac(single phase)
Grid Typesingle phase
Current Harmonic DistortionTHD<3%(Linear load <1.5%)
Efficiency
Max. Efficiency97.90%
Euro Efficiency96.90%
MPPT Efficiency99.90%
Protection
IntegratedPV Input Lightning Protection, Anti-islanding Protection, PV String Input Reverse Polarity Protection,
Insulation Resistor Detection, Residual Current Monitoring Unit, Output Over Current Protection,
Output Shorted Protection
PV ARC Fault DetectionOptional
Output Over Voltage ProtectionDC Type II/AC Type III
Certification and Standards
Grid RegulationCEI 0-21,VDE-AR-N 4105,NRS 097,IEC61727,G99,G98,VDE 0126-1-1,RD 1699,C10-11
EMC/Safety RegulationIEC/EN 62109-1 IEC/EN 62109-2,IEC/EN 61000-6-1,IEC/EN 61000-6-2, IEC/EN 61000-6-3, IEC/EN 61000-6-4
General Data
Operating Temperature Range(℃)-45~60,>45 Derating
CoolingSmart cooling
Noise(dB)≤45
Communication with BMSCAN, RS485 34
Weight (kg)34
Dimensions (mm)514W ×749H ×291D
Protection DegreeIP65
Installation StyleWall-mounted

Our gallery

Product Details

CHISAGE ESS JUP Series Hybrid Inverter Scene Diagram 01
CHISAGE ESS JUP Series Hybrid Inverter Scene Diagram 02

Different energy meet the vast majority of scenarios. We provide on-site installation and usage guidance services, making it easy for you to buy and use.

CHISAGE ESS JUP Series Hybrid Inverter Scene Diagram 03

Product Introduction

If you have any questions during the browsing process, please feel free to contact us and communicate with us at any time.
CHISAGE ESS Jup-5-10G2-LE Hybrid Inverter Feature Image 03-2(1)

Support Less than 5ms on/off Grid Mode Switch

Chisage ESS single phase hybrid inverter is designed to support fast switching between on-grid and off-grid mode in less than 5 milliseconds, ensuring a seamless transition between on-grid and off-grid operation.

Independent AC Input Port for Diesel Generator

Chisage ESS single phase hybrid inverters have an independent AC input port specifically designed for connection to a diesel generator. This allows seamless integration of backup power from the generator when needed.

CHISAGE ESS Jup-5-10G2-LE Hybrid Inverter Feature Image 02-2(1)

Unleash the potential for unlimited possibilities!

Click to learn more about us and move towards a new era of energy together!

播放有关的视频 CHISAGE Group Einführungsvideo-2

Application Cases​

We have served thousands of customers and have rich service experience.
12kW Solar Energy Storage System in South Africa-1

South Africa Installation Case

12kW Solar Energy Storage System in South Africa

Guatemala Installation Case

12kW Solar Energy Storage System in Lebanon

12kW Solar Energy Storage System in Lebanon-1

What Our Customers Have to Say

Real feedback from users can better reflect the professionalism of our products.

FAQ

Most frequent questions and answers

CHISAGE ESS supports a variety of payment methods, such as T/T, L/C, Alibaba Trade Guarantee Payment, paypal, alipay and others. If we enter into strategic cooperation, we can communicate with you about payment methods such as DP.

CHISAGE ESS is a factory 50 kilometers away from Ningbo port, which is very convenient for loading and shipping, and saves a lot of transportation cost. We have a R&D and engineering team of more than 30 people for energy storage systems and solar inverter technology. Now we have over 1.5GWh manufacturing capacity for lithium iron phosphate battery packs and 1GW for inverters.

We purchase Haichen cells which is the Top brand in China, and assemble them in our workshop.

CHISAGE ESS welcomes you to test our quality by sample. Samples will be prepared and sent out within 7 working days after the specification is confirmed.

Related articles

Relevant information can also assist you.

contact us

Share with Us Your Needs, Our Team Will Get Back to You within 8 Working Hours!

Click on the buttons to the right for more about our products, the best price, and energy storage solutions!